01Step 1 · Supplier verification
Establish what kind of supplier you are talking to. Factories discuss substrates, pressing and finish systems in detail, send production samples and talk production scheduling naturally. An intermediary adds a layer between you and exactly the decisions that determine whether your order succeeds.
02Step 2 · Samples and the master sample
Request production samples of the exact configuration, approve under lighting close to end use, and lock the approved sample as the master sample for the order — the production reference every batch is made against.
03Step 3 · Specification in the contract
Substrate, thickness, dimensions, finish and packaging go into the order specification — not into a WhatsApp conversation. The specification is what converts a dispute into a fixable fact.
04Step 4 · MOQ as a container structure
Panel MOQ is a container-structure question, not a price-haggling question. One container can hold a mix of designs and substrate configurations sized to your demand structure.
05Step 5 · Quality documentation
Emissions classification and configuration characteristics should be confirmed before production, not after. We do not claim what we do not document — and neither should your supplier.
06Step 6 · Logistics and payment rhythm
Full containers move with the fewest touches: factory to port, port to your warehouse. Balance payment structure against production and shipping documents, and keep the rhythm consistent across orders.